I define the hypothesis before any code.
What we believe will improve, for whom, and why, with the success metric and baseline agreed before design starts.
GROWTH EXPERIMENTS & ACTIVATION · SERVICE 02
I design, test, and measure product changes so you can decide with data what to scale before you build it.
Leandro Balbian · Growth Product Manager & Product Designer · 8 years in B2B SaaS and marketplaces
02 / THE PROBLEM
The demand is already there: traffic comes in and users sign up. But somewhere in the flow, intent breaks, and the team ships changes without knowing which one moved the metric.
THE RULE
Measure to decide, not to decorate the experiment.
03 / HOW I DO IT
What we believe will improve, for whom, and why, with the success metric and baseline agreed before design starts.
The flow, content, or change to test, in a prototype your team can test in days.
At the end, we compare against the baseline and make a data-backed call: scale, iterate, or kill.
04 / WHERE I STEP IN
ONBOARDING
Users reach the moment they understand the value, fast.
ACTIVATION
More users completing the action that predicts they'll stay.
CONVERSION
Forms, checkout, or lead capture with less drop-off.
RECOVERY
Flows that rescue users when the main path fails.
I measure with GA4, Microsoft Clarity, and Metabase, or with whatever tools your team already uses.
05 / WHAT THE SPRINT LOOKS LIKE
BEFORE WE START
WHAT I DO
I review the leak you've already identified and the tracking you have.
WITH YOUR TEAM
Read access and the metric we want to move.
WEEK 1
WHAT I DO
I write the hypothesis, the success metric, and the baseline.
WITH YOUR TEAM
Kickoff session (60 min).
WEEK 2
WHAT I DO
I design the flow and the prototype, and spec the events to track.
WITH YOUR TEAM
Prototype review with product and engineering (60 min).
MEASUREMENT
WHAT I DO
I read the results against the baseline and put together the readout.
WITH YOUR TEAM
Decision session: scale, iterate, or kill (60 min).
Important: the measurement window depends on your traffic, and we set it together in week 1. I recommend a PM and someone from engineering join all three sessions.
06 / WHAT YOU GET
FORMAT
1-page document
WHAT YOU DO WITH IT
Align product, design, and engineering on what's being tested, for whom, and with which metric.
FORMAT
Figma file + clickable prototype
WHAT YOU DO WITH IT
Your team tests it with users or takes it into development without reinterpreting it.
FORMAT
Events and decision metric
WHAT YOU DO WITH IT
Data or engineering implements tracking knowing exactly what to measure.
FORMAT
Results against the baseline
WHAT YOU DO WITH IT
Decide whether to scale, iterate, or kill, and what to test next.
You don't always need an A/B test: depending on traffic and risk, it can be a gradual rollout or a prototype validated before development.
07 / BEFORE AND AFTER
Each step builds on the last: the diagnosis defines what to test, the experiment validates it, and the product scales what worked, without re-explaining the problem from scratch.
01 · PRODUCT & GROWTH DIAGNOSIS
If it's still not clear where conversion leaks, the diagnosis finds the cause and the priority.
03 · COMPLEX PRODUCT DESIGN
When the experiment validates the bet, I design the full solution: flows, roles, a design system, and handoff.
08 / RELATED CASE STUDIES
GROWTH
A recovery flow that keeps intent alive when inventory isn't available. Proposal ready for validation.
GROWTH DECISION STUDY
A prioritized rescue queue for customers with real intent who never reached a broker.
PRODUCT DESIGN
Sensitive flows with multiple entry points and continuity between actions.
09 / NEXT STEP
Give me a quick rundown of where the flow breaks and I'll reply with a first idea of what to test.
No. The focus is improving the product experience to convert the demand you already have.
No. The technique depends on traffic, risk, and operational capacity. It can be a rollout, a working prototype, or a test before full development.
I define the signal and the spec with your team. Data or engineering implements tracking where needed.
It depends on your traffic and the size of the change we expect to see. We set it together in week 1, before launch.